Compare & price
Home › Data centers › United States › Lexington

Server colocation & hosting in Lexington

Lexington has 1 data center listed on DataColoc, operated notably by QX.Net. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Lexington (server housing) relies on one listed data center, operated by QX.Net. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in Lexington?

DataColoc lists 1 data center offering colocation in Lexington (QX.Net). The nearest alternatives are listed below, with their distance.

What connectivity is available in Lexington?

IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Lexington?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Lexington →

QX.Net Lexington

QX.Net · 40507
on quote

What Lexington allows

The data center listed in Lexington is operated by QX.Net.

The electricity behind Lexington

A city has no electricity of its own: the sites in Lexington are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 40% (2025). The detail: natural gas 40%, nuclear 17.4%, coal 16.3%, wind 10.3%, solar 8.6%, hydro 5.3%. Fossil fuels (coal, gas, oil) account for 57% of it. A kilowatt-hour there weighs 384 g of CO2, i.e. 1.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 13.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Lexington

Since 1970, 1 earthquake of magnitude 5 or above has been recorded within 100 km of Lexington, and 1 within 200 km. The strongest: magnitude 5 in 1980, 51 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Lexington does not allow

With a single listed site, Lexington cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Lexington

The nearest site outside Lexington is 104 km away, in Florence. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in United States