Compare & price
HomeData centersUnited StatesNorwood

Data centers in Norwood

Norwood has 1 data center listed on DataColoc, operated notably by Encore Technologies. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Norwood (server housing) relies on one listed data center, operated by Encore Technologies. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in Norwood?

DataColoc lists 1 data center offering colocation in Norwood (Encore Technologies). The nearest alternatives are listed below, with their distance.

What connectivity is available in Norwood?

IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Norwood?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Norwood →

Encore Technologies NOR1

Encore Technologies · 45212
on quote

What Norwood allows

The data center listed in Norwood is operated by Encore Technologies.

The electricity behind Norwood

A city has no electricity of its own: the sites in Norwood are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 40% (2025). The detail: natural gas 40%, nuclear 17.4%, coal 16.3%, wind 10.3%, solar 8.6%, hydro 5.3%. Fossil fuels (coal, gas, oil) account for 57% of it. A kilowatt-hour there weighs 384 g of CO2, i.e. 1.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 13.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Norwood

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Norwood, and 1 within 200 km. The strongest: magnitude 5 in 1980, 116 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Norwood does not allow

With a single listed site, Norwood cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Norwood

The nearest site outside Norwood is 9 km away, in Cincinnati (8 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in United States