Compare & price
HomeData centersUnited StatesChandler

Data centers in Chandler

Chandler has 9 data centers listed on DataColoc, operated notably by Digital Realty, H5 Data Centers, DataBank, Ltd., CyrusOne, Evoque. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Chandler (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 9 data centers offering colocation in Chandler, including Digital Realty, H5 Data Centers, DataBank, Ltd., CyrusOne. Its top-connected site lists 13 networks and 1 internet exchange point (IXP).

Frequently asked questions

How much does a rack (colocation) cost in Chandler?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 9 data centers in Chandler to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Chandler are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Chandler really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Chandler, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€865 – €1,041
Cost per kW per month€151 – €177
Over 3 years (36 months)€31,140 – €37,476

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a USD conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Chandler →

Digital Realty PHX15 (2121 S Price Rd)

Digital Realty · 85286
1 baieTier III (indicative)6 networks present
on quote

H5 Data Centers Phoenix

H5 Data Centers · 85286
13 networks present
on quote

DataBank Phoenix (PHX3)

DataBank, Ltd. · 85286-7205
on quote

CyrusOne PHX1

CyrusOne
Tier III (indicative)
on quote

CyrusOne PHX5

CyrusOne
Tier III (indicative)
on quote

CyrusOne PHX6

CyrusOne
Tier III (indicative)
on quote

CyrusOne PHX4

CyrusOne
Tier III (indicative)
on quote

CyrusOne Chandler AZ I

CyrusOne
Tier III (indicative)
on quote

Evoque Chandler AZ

Evoque
on quote

What Chandler allows

Chandler has 9 data centers, operated by Digital Realty, H5 Data Centers, DataBank, Ltd., CyrusOne. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Connectivity from Chandler

13 networks are listed at the sites in Chandler according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Amazon Web Services, Google, Apple, Meta, Cloudflare, Fastly: they are present at the exchange point where 2 of the 9 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Chandler

A city has no electricity of its own: the sites in Chandler are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 40% (2025). The detail: natural gas 40%, nuclear 17.4%, coal 16.3%, wind 10.3%, solar 8.6%, hydro 5.3%. Fossil fuels (coal, gas, oil) account for 57% of it. A kilowatt-hour there weighs 384 g of CO2, i.e. 1.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 13.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Chandler

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Chandler, and 1 within 200 km. The strongest: magnitude 5.1 in 2005, 181 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Chandler does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Chandler

The nearest site outside Chandler is 10 km away, in Gilbert. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in United States

Advertisement