Compare & price
HomeData centersUnited StatesBaltimore

Data centers in Baltimore

Baltimore has 7 data centers listed on DataColoc, operated notably by TierPoint, LLC, AiNET, Crown Castle Inc., Expedient, Lumen Technologies Inc, Zayo Group. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Baltimore (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 7 data centers offering colocation in Baltimore, including TierPoint, LLC, AiNET, Crown Castle Inc., Expedient.

Frequently asked questions

How much does a rack (colocation) cost in Baltimore?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 7 data centers in Baltimore to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Baltimore are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Baltimore really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Baltimore, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€756 – €946
Cost per kW per month€135 – €163
Over 3 years (36 months)€27,216 – €34,056

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a USD conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Baltimore →

TierPoint Baltimore

TierPoint, LLC · 21230
7 networks present
on quote

AiNET MD-300L

AiNET · 21201
3 networks present
on quote

Crown Castle Baltimore (111 Market, 700 E Pratt)

Crown Castle Inc. · 21202-4035
8 networks present
on quote

Expedient Baltimore - Owings Mills

Expedient · 21117
1 networks present
on quote

Expedient Tidepoint

Expedient
on quote

Lumen Baltimore

Lumen Technologies Inc · 21201
2 networks present
on quote

Zayo Baltimore - 111 Market Pl

Zayo Group · 21202
8 networks present
on quote

What Baltimore allows

Baltimore has 7 data centers, operated by TierPoint, LLC, AiNET, Crown Castle Inc., Expedient.

Connectivity from Baltimore

8 networks are listed at the sites in Baltimore according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

Compliance and sovereignty

Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Baltimore

A city has no electricity of its own: the sites in Baltimore are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 40% (2025). The detail: natural gas 40%, nuclear 17.4%, coal 16.3%, wind 10.3%, solar 8.6%, hydro 5.3%. Fossil fuels (coal, gas, oil) account for 57% of it. A kilowatt-hour there weighs 384 g of CO2, i.e. 1.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 13.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Baltimore

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Baltimore, and 1 within 200 km. The strongest: magnitude 5.8 in 2011, 191 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Baltimore does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Baltimore

The nearest site outside Baltimore is 11 km away, in Linthicum Heights (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in United States

Advertisement