Compare & price
HomeData centersUnited StatesAsheville

Data centers in Asheville

Asheville has 3 data centers listed on DataColoc, operated notably by Netriplex, ERC Broadband, DartPoints, LLC. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Asheville (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 3 data centers offering colocation in Asheville, including Netriplex, ERC Broadband, DartPoints, LLC.

Frequently asked questions

How much does a rack (colocation) cost in Asheville?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 3 data centers in Asheville to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Asheville are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Asheville really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Asheville, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€661 – €837
Cost per kW per month€122 – €147
Over 3 years (36 months)€23,796 – €30,132

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a USD conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Asheville →

Netriplex

Netriplex · 28803
on quote

ERC Broadband

ERC Broadband · 28801
6 networks present
on quote

DartPoints Asheville, NC - AVL1

DartPoints, LLC · 28803-5009
5 networks present
on quote

What Asheville allows

Asheville has 3 data centers, operated by Netriplex, ERC Broadband, DartPoints, LLC.

Connectivity from Asheville

6 networks are listed at the sites in Asheville according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Asheville

A city has no electricity of its own: the sites in Asheville are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 40% (2025). The detail: natural gas 40%, nuclear 17.4%, coal 16.3%, wind 10.3%, solar 8.6%, hydro 5.3%. Fossil fuels (coal, gas, oil) account for 57% of it. A kilowatt-hour there weighs 384 g of CO2, i.e. 1.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 13.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Asheville

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Asheville, and 1 within 200 km. The strongest: magnitude 5.1 in 2020, 171 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Asheville does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Asheville

The nearest site outside Asheville is 44 km away, in Mill Spring. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in United States

Advertisement