Compare & price
HomeData centersSpainMurcia

Data centers in Murcia

Murcia has 3 data centers listed on DataColoc, operated notably by KIO, CPD Titan, KIO Networks España. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Murcia (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 3 data centers offering colocation in Murcia, including KIO, CPD Titan, KIO Networks España.

Frequently asked questions

How much does a rack (colocation) cost in Murcia?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 3 data centers in Murcia to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Murcia are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Murcia really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Murcia, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€758 – €902
Cost per kW per month€131 – €157
Over 3 years (36 months)€27,288 – €32,472

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Murcia →

KIO Murcia 1 (MUR1)

KIO · 30100
Sovereign (outside US CLOUD Act)2 networks present
on quote

CPD Titan

CPD Titan · 30100
Sovereign (outside US CLOUD Act)8 networks present
on quote

Data Center KIO Murcia

KIO Networks España
Sovereign (outside US CLOUD Act)
on quote

What Murcia allows

Murcia has 3 data centers, operated by KIO, CPD Titan, KIO Networks España.

Connectivity from Murcia

8 networks are listed at the sites in Murcia according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Murcia

A city has no electricity of its own: the sites in Murcia are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, solar, supplies only 21.8% (2025). The detail: solar 21.8%, natural gas 21.6%, wind 20.4%, nuclear 18.8%, hydro 11.4%, oil (fuel oil, diesel) 3.5%. Fossil fuels (coal, gas, oil) account for 25.4% of it. A kilowatt-hour there weighs 154 g of CO2, i.e. 3 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 5.5 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Murcia

Since 1970, 2 earthquakes of magnitude 5 or above have been recorded within 100 km of Murcia, and 5 within 200 km. The strongest: magnitude 5.6 in 1976, 98 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Murcia does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Murcia

The nearest site outside Murcia is 6 km away, in Benahavis. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Spain

Advertisement