Compare & price
HomeData centersBrazilOsasco

Data centers in Osasco

Osasco has 12 data centers listed on DataColoc, operated notably by Ascenty DataCenters e Telecom, Digital Realty. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Osasco (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 12 data centers offering colocation in Osasco, including Ascenty DataCenters e Telecom, Digital Realty.

Frequently asked questions

How much does a rack (colocation) cost in Osasco?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 12 data centers in Osasco to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Osasco are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Osasco really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Osasco, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€850 – €1,500
Cost per kW per month€150 – €270
Over 3 years (36 months)€30,600 – €54,000

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a BRL conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Osasco →

Ascenty SP1 - São Paulo

Ascenty DataCenters e Telecom
on quote

Ascenty SPO04 - São Paulo

Ascenty DataCenters e Telecom
on quote

Ascenty SP2

Digital Realty
1 baieTier III (indicative)
on quote

Ascenty SP1

Digital Realty
1 baieTier III (indicative)
on quote

Ascenty SP3

Digital Realty
1 baieTier III (indicative)
on quote

Ascenty SP4

Digital Realty
1 baieTier III (indicative)
on quote

Ascenty SPO01 - São Paulo

Ascenty DataCenters e Telecom
on quote

Ascenty SPO02 - São Paulo

Ascenty DataCenters e Telecom
on quote

Ascenty SPO03 - São Paulo

Ascenty DataCenters e Telecom
on quote

Ascenty SP3 - São Paulo

Ascenty DataCenters e Telecom
on quote

Ascenty SP4 - São Paulo

Ascenty DataCenters e Telecom
on quote

Ascenty SP2 - São Paulo

Ascenty DataCenters e Telecom
on quote

What Osasco allows

Osasco has 12 data centers, operated by Ascenty DataCenters e Telecom, Digital Realty. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Compliance and sovereignty

Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Osasco

A city has no electricity of its own: the sites in Osasco are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 51.8% of its electricity from hydro (2025). The detail: hydro 51.8%, wind 15.7%, solar 11.8%, natural gas 7.3%, bioenergy 7.3%, coal 2.3%. Fossil fuels (coal, gas, oil) account for 11.3% of it. A kilowatt-hour there weighs 110 g of CO2, i.e. 4.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 3.9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Osasco

No earthquake of magnitude 5 or above has been recorded within 200 km of Osasco since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Osasco does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Osasco

The nearest site outside Osasco is 4 km away, in Tamboré. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Brazil

Advertisement