Compare & price
Home › Data centers › Brazil › Manaus

Server colocation & hosting in Manaus

Manaus has 7 data centers listed on DataColoc, operated notably by CLICKIP PROVEDORES DE ACESSO LTDA, PRODAM Processamento de Dados Amazonas S.A, Eyes Nwhere Sistemas Inteligentes de Imagem Ltda, BENCHIMOL IRMAO & CIA LTDA, Rivernet, 4WNET ES TELECOMUNICAÇÕES LTDA. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Manaus (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 7 data centers offering colocation in Manaus, including CLICKIP PROVEDORES DE ACESSO LTDA, PRODAM Processamento de Dados Amazonas S.A, Eyes Nwhere Sistemas Inteligentes de Imagem Ltda, BENCHIMOL IRMAO & CIA LTDA. Its top-connected site lists 5 networks and 1 internet exchange point (IXP).

Frequently asked questions

How much does a rack (colocation) cost in Manaus?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 7 data centers in Manaus to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Manaus are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Manaus really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Manaus, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€956 – €1,183
Cost per kW per month€170 – €211
Over 3 years (36 months)€34,416 – €42,588

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a BRL conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Manaus →

Click IP Data Centers - Manaus

CLICKIP PROVEDORES DE ACESSO LTDA
on quote

PIX Prodam

PRODAM Processamento de Dados Amazonas S.A · 69020-110
2 networks present
on quote

PIX Eyes Nwhere

Eyes Nwhere Sistemas Inteligentes de Imagem Ltda · 69055-736
3 networks present
on quote

PIX Bemol

BENCHIMOL IRMAO & CIA LTDA · 69005901
on quote

PIX Rivernet

Rivernet · 69057-035
2 networks present
on quote

4wnet Telecomunicações - Amazonas

4WNET ES TELECOMUNICAÇÕES LTDA · 69057-060
1 networks present
on quote

PIX K3G Manaus

4WNET ES TELECOMUNICAÇÕES LTDA · 69097418
5 networks present
on quote

What Manaus allows

Manaus has 7 data centers, operated by CLICKIP PROVEDORES DE ACESSO LTDA, PRODAM Processamento de Dados Amazonas S.A, Eyes Nwhere Sistemas Inteligentes de Imagem Ltda, BENCHIMOL IRMAO & CIA LTDA.

Connectivity from Manaus

5 networks are listed at the sites in Manaus according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

Compliance and sovereignty

Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Manaus

A city has no electricity of its own: the sites in Manaus are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 51.8% of its electricity from hydro (2025). The detail: hydro 51.8%, wind 15.7%, solar 11.8%, natural gas 7.3%, bioenergy 7.3%, coal 2.3%. Fossil fuels (coal, gas, oil) account for 11.3% of it. A kilowatt-hour there weighs 110 g of CO2, i.e. 4.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 3.9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Manaus

No earthquake of magnitude 5 or above has been recorded within 200 km of Manaus since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Manaus does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Manaus

The nearest site outside Manaus is 662 km away, in Boa Vista (3 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Brazil

Advertisement