Compare & price
HomeData centersBrazilAracaju

Data centers in Aracaju

Aracaju has 4 data centers listed on DataColoc, operated notably by Wanhouse Soluções em Tecnologia LTDA - EPP, G8, Softdados Telecomunicações, Emgetis. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Aracaju (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 4 data centers offering colocation in Aracaju, including Wanhouse Soluções em Tecnologia LTDA - EPP, G8, Softdados Telecomunicações, Emgetis.

Frequently asked questions

How much does a rack (colocation) cost in Aracaju?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 4 data centers in Aracaju to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Aracaju are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Aracaju really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Aracaju, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€863 – €1,118
Cost per kW per month€152 – €200
Over 3 years (36 months)€31,068 – €40,248

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a BRL conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Aracaju →

IDC Wanhouse

Wanhouse Soluções em Tecnologia LTDA - EPP
on quote

PIX G8 Aracaju

G8 · 49010-150
1 networks present
on quote

Softdados Aracaju POP

Softdados Telecomunicações · 49010-150
1 networks present
on quote

PIX Emgetis

Emgetis · 49027-010
on quote

What Aracaju allows

Aracaju has 4 data centers, operated by Wanhouse Soluções em Tecnologia LTDA - EPP, G8, Softdados Telecomunicações, Emgetis.

Connectivity from Aracaju

1 network is listed at the sites in Aracaju according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

The electricity behind Aracaju

A city has no electricity of its own: the sites in Aracaju are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 51.8% of its electricity from hydro (2025). The detail: hydro 51.8%, wind 15.7%, solar 11.8%, natural gas 7.3%, bioenergy 7.3%, coal 2.3%. Fossil fuels (coal, gas, oil) account for 11.3% of it. A kilowatt-hour there weighs 110 g of CO2, i.e. 4.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 3.9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Aracaju

No earthquake of magnitude 5 or above has been recorded within 200 km of Aracaju since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Aracaju does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Aracaju

The nearest site outside Aracaju is 205 km away, in Maceió. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Brazil

Advertisement