Perth has 9 data centers listed on DataColoc, operated notably by DC West Pty Ltd, CBRE Managing Agent, Equinix, Vocus Group, NEXTDC, DC Alliance. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.
Server colocation in Perth (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 9 data centers offering colocation in Perth, including DC West Pty Ltd, CBRE Managing Agent, Equinix, Vocus Group.
a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 9 data centers in Perth to get a costed quote.
None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.
2 of the 9 data centers listed in Perth declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.
Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.
Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.
Beyond listed prices, here is the computed cost of a standard 5 kW rack in Perth, from our open market model (published method, version 2026.07-v1):
| Item | Estimate |
|---|---|
| 5 kW rack, per month | €1,008 – €1,312 |
| Cost per kW per month | €179 – €235 |
| Over 3 years (36 months) | €36,288 – €47,232 |
Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a AUD conversion until a dated, sourced rate backs it.
What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.
An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.
Compare data centers in Perth →Perth has 9 data centers, operated by DC West Pty Ltd, CBRE Managing Agent, Equinix, Vocus Group. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.
50 networks are listed at the sites in Perth according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 3 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Amazon Web Services, Microsoft Azure, Apple, Akamai, Cloudflare, Fastly: they are present at the exchange points where 3 of the 9 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.
Declared certifications: ISO 22301, ISO 27001, ISO 50001, PCI DSS, SOC 2. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.
A city has no electricity of its own: the sites in Perth are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, coal, supplies only 42.7% (2025). The detail: coal 42.7%, solar 19.6%, natural gas 16.4%, wind 13.7%, hydro 4.3%, oil (fuel oil, diesel) 2.2%. Fossil fuels (coal, gas, oil) account for 61.3% of it. A kilowatt-hour there weighs 525 g of CO2, i.e. 1.1 times the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 18.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.
Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.
Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Perth, and 5 within 200 km. The strongest: magnitude 6.1 in 1979, 179 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.
Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.
No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.
The nearest site outside Perth is 5 km away, in Shenton Park. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.