Compare & price
Home › Data centers › Australia › Baulkham Hills

Server colocation & hosting in Baulkham Hills

Baulkham Hills has 2 data centers listed on DataColoc, operated notably by Enterprise Data Corporation (EDC), Vocus Group. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Baulkham Hills (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Baulkham Hills, including Enterprise Data Corporation (EDC), Vocus Group. Its top-connected site lists 2 networks.

Frequently asked questions

How much does a rack (colocation) cost in Baulkham Hills?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Baulkham Hills to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Baulkham Hills are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Baulkham Hills really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Baulkham Hills, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€857 – €1,286
Cost per kW per month€151 – €231
Over 3 years (36 months)€30,852 – €46,296

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a AUD conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Baulkham Hills →

Enterprise Data Corporation (EDC1 - Sydney)

Enterprise Data Corporation (EDC)
on quote

Vocus Sydney SYD02

Vocus Group · 2153
2 networks present
on quote

What Baulkham Hills allows

Baulkham Hills has 2 data centers, operated by Enterprise Data Corporation (EDC), Vocus Group.

Connectivity from Baulkham Hills

2 networks are listed at the sites in Baulkham Hills according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Baulkham Hills

A city has no electricity of its own: the sites in Baulkham Hills are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, coal, supplies only 42.7% (2025). The detail: coal 42.7%, solar 19.6%, natural gas 16.4%, wind 13.7%, hydro 4.3%, oil (fuel oil, diesel) 2.2%. Fossil fuels (coal, gas, oil) account for 61.3% of it. A kilowatt-hour there weighs 525 g of CO2, i.e. 1.1 times the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 18.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Baulkham Hills

Since 1970, 2 earthquakes of magnitude 5 or above have been recorded within 100 km of Baulkham Hills, and 4 within 200 km. The strongest: magnitude 5.5 in 1973, 78 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Baulkham Hills does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Baulkham Hills

The nearest site outside Baulkham Hills is 11 km away, in Huntingwood (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Australia

Advertisement