Data centers in San Salvador de Jujuy

San Salvador de Jujuy has 1 data center listed on DataColoc, operated notably by Cámara Argentina de Internet (CABASE). Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in San Salvador de Jujuy →

Cabase JUJ

Cámara Argentina de Internet (CABASE) · 4600
9 networks present
on quote

What San Salvador de Jujuy allows

The data center listed in San Salvador de Jujuy is operated by Cámara Argentina de Internet (CABASE).

Connectivity from San Salvador de Jujuy

9 networks are listed at the sites in San Salvador de Jujuy according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Amazon Web Services, Google, Microsoft Azure, Meta, Cloudflare, Fastly: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

The electricity behind San Salvador de Jujuy

A city has no electricity of its own: the sites in San Salvador de Jujuy are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 52.7% of its electricity from natural gas (2025). The detail: natural gas 52.7%, hydro 17.1%, wind 12.2%, nuclear 7%, oil (fuel oil, diesel) 3.9%, solar 3.4%. Fossil fuels (coal, gas, oil) account for 58.4% of it. A kilowatt-hour there weighs 346 g of CO2, i.e. 1.3 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 12.3 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under San Salvador de Jujuy

Since 1970, 14 earthquakes of magnitude 5 or above have been recorded within 100 km of San Salvador de Jujuy, and 238 within 200 km. The strongest: magnitude 7.2 in 2000, 134 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What San Salvador de Jujuy does not allow

With a single listed site, San Salvador de Jujuy cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near San Salvador de Jujuy

The nearest site outside San Salvador de Jujuy is 63 km away, in Salta. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.