Compare & price
HomeData centersArgentinaRío Cuarto

Data centers in Río Cuarto

Río Cuarto has 2 data centers listed on DataColoc, operated notably by Cámara Argentina de Internet (CABASE), Universidad Nacional de Rio Cuarto. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Río Cuarto (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Río Cuarto, including Cámara Argentina de Internet (CABASE), Universidad Nacional de Rio Cuarto.

Frequently asked questions

How much does a rack (colocation) cost in Río Cuarto?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Río Cuarto to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Río Cuarto are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Río Cuarto really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Río Cuarto, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€949 – €1,378
Cost per kW per month€169 – €248
Over 3 years (36 months)€34,164 – €49,608

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Río Cuarto →

Cabase RCU

Cámara Argentina de Internet (CABASE) · X5016
10 networks present
on quote

Universidad Nacional de Río Cuarto - UTI

Universidad Nacional de Rio Cuarto · X5804BYA
on quote

What Río Cuarto allows

Río Cuarto has 2 data centers, operated by Cámara Argentina de Internet (CABASE), Universidad Nacional de Rio Cuarto.

Connectivity from Río Cuarto

10 networks are listed at the sites in Río Cuarto according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Amazon Web Services, Google, Microsoft Azure, Meta, Cloudflare, Fastly: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

The electricity behind Río Cuarto

A city has no electricity of its own: the sites in Río Cuarto are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 52.7% of its electricity from natural gas (2025). The detail: natural gas 52.7%, hydro 17.1%, wind 12.2%, nuclear 7%, oil (fuel oil, diesel) 3.9%, solar 3.4%. Fossil fuels (coal, gas, oil) account for 58.4% of it. A kilowatt-hour there weighs 346 g of CO2, i.e. 1.3 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 12.3 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Río Cuarto

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Río Cuarto, and 2 within 200 km. The strongest: magnitude 5.6 in 2016, 187 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Río Cuarto does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Río Cuarto

The nearest site outside Río Cuarto is 132 km away, in Córdoba (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Argentina