Data centers in Wolfsburg

Wolfsburg has 1 data center listed on DataColoc, operated notably by WOBCOM GmbH. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Wolfsburg →

Wolfsburg Nordkopf Tower (WNT)

WOBCOM GmbH ยท 38440
Sovereign (outside US CLOUD Act)8 networks present
on quote

What Wolfsburg allows

The data center listed in Wolfsburg is operated by WOBCOM GmbH.

Connectivity from Wolfsburg

8 networks are listed at the sites in Wolfsburg according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Wolfsburg

A city has no electricity of its own: the sites in Wolfsburg are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, wind, supplies only 27.2% (2025). The detail: wind 27.2%, coal 20.6%, solar 17.9%, natural gas 16.5%, bioenergy 10.1%, hydro 3.9%. Fossil fuels (coal, gas, oil) account for 40.9% of it. A kilowatt-hour there weighs 330 g of CO2, i.e. 1.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 11.7 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Wolfsburg

No earthquake of magnitude 5 or above has been recorded within 200 km of Wolfsburg since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Wolfsburg does not allow

With a single listed site, Wolfsburg cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Wolfsburg

The nearest site outside Wolfsburg is 56 km away, in Sehnde. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.