Compare & price
Home › Data centers › Germany › Sehnde

Server colocation & hosting in Sehnde

Sehnde has 1 data center listed on DataColoc, operated notably by envia TEL GmbH. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Sehnde (server housing) relies on one listed data center, operated by envia TEL GmbH. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in Sehnde?

DataColoc lists 1 data center offering colocation in Sehnde (envia TEL GmbH). The nearest alternatives are listed below, with their distance.

What connectivity is available in Sehnde?

IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Sehnde?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Sehnde →

Datacenter Hannover

envia TEL GmbH · 31319
Sovereign (outside US CLOUD Act)
on quote

What Sehnde allows

The data center listed in Sehnde is operated by envia TEL GmbH.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Sehnde

A city has no electricity of its own: the sites in Sehnde are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, wind, supplies only 27.2% (2025). The detail: wind 27.2%, coal 20.6%, solar 17.9%, natural gas 16.5%, bioenergy 10.1%, hydro 3.9%. Fossil fuels (coal, gas, oil) account for 40.9% of it. A kilowatt-hour there weighs 330 g of CO2, i.e. 1.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 11.7 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Sehnde

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Sehnde, and 2 within 200 km. The strongest: magnitude 5.4 in 1989, 179 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Sehnde does not allow

With a single listed site, Sehnde cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Sehnde

The nearest site outside Sehnde is 7 km away, in Lehrte. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Germany