Compare & price
HomeData centersGermanyMunich

Data centers in Munich

Munich has 14 data centers listed on DataColoc, operated notably by EdgeConneX Inc., Equinix, Inc., NTT DATA's Global Data Centers division, NorthC Deutschland GmbH, euNetworks Group, SpaceNet. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Munich (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 14 data centers offering colocation in Munich, including EdgeConneX Inc., Equinix, Inc., NTT DATA's Global Data Centers division, NorthC Deutschland GmbH. Its top-connected site lists 65 networks and 3 internet exchange points (IXPs).

Frequently asked questions

How much does a rack (colocation) cost in Munich?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 14 data centers in Munich to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Munich are ISO 27001 certified?

2 of the 14 data centers listed in Munich declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Munich really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Munich, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€1,121 – €1,268
Cost per kW per month€204 – €229
Over 3 years (36 months)€40,356 – €45,648

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Munich →

EdgeConneX Munich (EDCMUC01)

EdgeConneX Inc. · 80687
Tier III (indicative)37 networks present
on quote

Equinix MU1/MU3 - Munich

Equinix, Inc. · 80335
1 baieTier III (indicative)Cert.: ISO 22301, ISO 27001, ISO 50001, PCI DSS68 networks present
on quote

NTT Munich 1 Data Center (MUC1)

NTT DATA's Global Data Centers division · 85551
Sovereign (outside US CLOUD Act)Tier III (indicative)4 networks present
on quote

NorthC Munich 2

NorthC Deutschland GmbH · 81829
Sovereign (outside US CLOUD Act)19 networks present
on quote

euNetworks Colocation Muenchen 1

euNetworks Group · 80634
Sovereign (outside US CLOUD Act)1 networks present
on quote

SpaceNet (LA)

SpaceNet · 80687
Sovereign (outside US CLOUD Act)3 networks present
on quote

NorthC Munich 1

NorthC Deutschland GmbH · 81541
Sovereign (outside US CLOUD Act)11 networks present
on quote

EMC Home of Data MUC I/II - MuCon-X

EMC Home of Data GmbH · 80939
Sovereign (outside US CLOUD Act)39 networks present
on quote

KPN Datacenter (Mchn-S1)

KPN EuroRings B.V. · 80335
Sovereign (outside US CLOUD Act)4 networks present
on quote

OD CLOUD MUN1

OD CLOUD (DIVERSITY) · 80335
Sovereign (outside US CLOUD Act)1 networks present
on quote

NTT Munich DC1

NTT
Sovereign (outside US CLOUD Act)Tier III (indicative)
on quote

Equinix MU1

Equinix
1 baieTier III (indicative)Cert.: ISO 22301, ISO 27001, ISO 50001, PCI DSS
on quote

Arelion Munich MCN

Arelion · 80807
Sovereign (outside US CLOUD Act)4 networks present
on quote

Global Crossing Munich

Colt Technology Services Group · 80335
Sovereign (outside US CLOUD Act)Tier III (indicative)3 networks present
on quote

What Munich allows

Munich has 14 data centers, operated by EdgeConneX Inc., Equinix, Inc., NTT DATA's Global Data Centers division, NorthC Deutschland GmbH. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Connectivity from Munich

68 networks are listed at the sites in Munich according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 3 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Alibaba Cloud, Amazon Web Services, DigitalOcean, Google, Hetzner, IBM Cloud, Microsoft Azure, Oracle Cloud and 7 more: they are present at the exchange points where 4 of the 14 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Declared certifications: ISO 22301, ISO 27001, ISO 50001, PCI DSS, SOC 2. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Munich

A city has no electricity of its own: the sites in Munich are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, wind, supplies only 27.2% (2025). The detail: wind 27.2%, coal 20.6%, solar 17.9%, natural gas 16.5%, bioenergy 10.1%, hydro 3.9%. Fossil fuels (coal, gas, oil) account for 40.9% of it. A kilowatt-hour there weighs 330 g of CO2, i.e. 1.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 11.7 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Munich

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Munich, and 3 within 200 km. The strongest: magnitude 5.3 in 1970, 189 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Munich does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Munich

The nearest site outside Munich is 9 km away, in Aschheim (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Germany

Advertisement