Compare & price
Home › Data centers › Germany › Mainhausen

Server colocation & hosting in Mainhausen

Mainhausen has 1 data center listed on DataColoc, operated notably by ITP-Solutions GmbH & Co. KG. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Mainhausen (server housing) relies on one listed data center, operated by ITP-Solutions GmbH & Co. KG. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. Its top-connected site lists 2 networks. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in Mainhausen?

DataColoc lists 1 data center offering colocation in Mainhausen (ITP-Solutions GmbH & Co. KG). The nearest alternatives are listed below, with their distance.

What connectivity is available in Mainhausen?

The site lists up to 2 networks. IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Mainhausen?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Mainhausen →

EnormateGreenCenter

ITP-Solutions GmbH & Co. KG · 63533
Sovereign (outside US CLOUD Act)2 networks present
on quote

What Mainhausen allows

The data center listed in Mainhausen is operated by ITP-Solutions GmbH & Co. KG.

Connectivity from Mainhausen

2 networks are listed at the sites in Mainhausen according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Mainhausen

A city has no electricity of its own: the sites in Mainhausen are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, wind, supplies only 27.2% (2025). The detail: wind 27.2%, coal 20.6%, solar 17.9%, natural gas 16.5%, bioenergy 10.1%, hydro 3.9%. Fossil fuels (coal, gas, oil) account for 40.9% of it. A kilowatt-hour there weighs 330 g of CO2, i.e. 1.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 11.7 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Mainhausen

Since 1970, 2 earthquakes of magnitude 5 or above have been recorded within 100 km of Mainhausen, and 5 within 200 km. The strongest: magnitude 5.4 in 1989, 98 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Mainhausen does not allow

With a single listed site, Mainhausen cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Mainhausen

The nearest site outside Mainhausen is 22 km away, in Offenbach (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Germany