Compare & price
HomeData centersGermanyFrankfurt am Main

Data centers in Frankfurt am Main

Frankfurt am Main has 7 data centers listed on DataColoc, operated notably by Iron Mountain Data Centers, NorthC Deutschland GmbH, MK Netzdienste, Equinix, Colt. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Frankfurt am Main (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 7 data centers offering colocation in Frankfurt am Main, including Iron Mountain Data Centers, NorthC Deutschland GmbH, MK Netzdienste, Equinix.

Frequently asked questions

How much does a rack (colocation) cost in Frankfurt am Main?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 7 data centers in Frankfurt am Main to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Frankfurt am Main are ISO 27001 certified?

1 of the 7 data centers listed in Frankfurt am Main declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Frankfurt am Main really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Frankfurt am Main, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€1,237 – €1,349
Cost per kW per month€223 – €243
Over 3 years (36 months)€44,532 – €48,564

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Frankfurt am Main →

Iron Mountain Data Center - Frankfurt (FRA-2)

Iron Mountain Data Centers · 60437
Tier III (indicative)6 networks present
on quote

NorthC Frankfurt 3

NorthC Deutschland GmbH · 60326
Sovereign (outside US CLOUD Act)9 networks present
on quote

MK Netzdienste Datacenter

MK Netzdienste · 65936
Sovereign (outside US CLOUD Act)36 networks present
on quote

Equinix FR13

Equinix
1 baieTier III (indicative)Cert.: ISO 22301, ISO 27001, ISO 50001, PCI DSS
on quote

Equinix FR9

Equinix
1 baieTier III (indicative)
on quote

Equinix FR11

Equinix
1 baieTier III (indicative)
on quote

Colt FRA74

Colt
Sovereign (outside US CLOUD Act)Tier III (indicative)
on quote

What Frankfurt am Main allows

Frankfurt am Main has 7 data centers, operated by Iron Mountain Data Centers, NorthC Deutschland GmbH, MK Netzdienste, Equinix. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Connectivity from Frankfurt am Main

36 networks are listed at the sites in Frankfurt am Main according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 4 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Alibaba Cloud, Amazon Web Services, DigitalOcean, Google, Hetzner, IBM Cloud, Microsoft Azure, Oracle Cloud and 8 more: they are present at the exchange points where 2 of the 7 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Declared certifications: ISO 22301, ISO 27001, ISO 50001, PCI DSS, SOC 2. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Frankfurt am Main

A city has no electricity of its own: the sites in Frankfurt am Main are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, wind, supplies only 27.2% (2025). The detail: wind 27.2%, coal 20.6%, solar 17.9%, natural gas 16.5%, bioenergy 10.1%, hydro 3.9%. Fossil fuels (coal, gas, oil) account for 40.9% of it. A kilowatt-hour there weighs 330 g of CO2, i.e. 1.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 11.7 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Frankfurt am Main

Since 1970, 1 earthquake of magnitude 5 or above has been recorded within 100 km of Frankfurt am Main, and 4 within 200 km. The strongest: magnitude 5.4 in 1989, 110 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Frankfurt am Main does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Frankfurt am Main

The nearest site outside Frankfurt am Main is 3 km away, in Frankfurt (38 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Germany

Advertisement