Compare & price
HomeData centersSouth AfricaJohannesburg

Data centers in Johannesburg

Johannesburg has 20 data centers listed on DataColoc, operated notably by Open Access Data Centres, Equinix, Inc., Teraco Data Environments Pty Ltd, Reflex Solutions (Pty) Ltd, NTT, Teraco. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Johannesburg (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 20 data centers offering colocation in Johannesburg, including Open Access Data Centres, Equinix, Inc., Teraco Data Environments Pty Ltd, Reflex Solutions (Pty) Ltd.

Frequently asked questions

How much does a rack (colocation) cost in Johannesburg?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 20 data centers in Johannesburg to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Johannesburg are ISO 27001 certified?

1 of the 20 data centers listed in Johannesburg declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Johannesburg really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Johannesburg, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€750 – €1,200
Cost per kW per month€130 – €210
Over 3 years (36 months)€27,000 – €43,200

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a ZAR conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Johannesburg →

NTT Data (MEA) - Parklands

Open Access Data Centres
21 networks present
on quote

Equinix JN1 - Johannesburg

Equinix, Inc.
1 baieTier III (indicative)Cert.: ISO 22301, ISO 27001, PCI DSS, SOC 29 networks present
on quote

Teraco Johannesburg Campus, South Africa

Teraco Data Environments Pty Ltd
390 networks present
on quote

Teraco Johannesburg Bredell Campus

Teraco Data Environments Pty Ltd · 1600
23 networks present
on quote

Reflex Solutions

Reflex Solutions (Pty) Ltd
6 networks present
on quote

OADC JNB1 - Johannesburg

Open Access Data Centres
10 networks present
on quote

Parklands

NTT
Tier III (indicative)
on quote

NTT Randview

NTT
Tier III (indicative)
on quote

Teraco JB1 East

Teraco
on quote

JB2 Data Centre

Teraco
on quote

OADC Isando

Open Access Data Centres
on quote

158 Jan Smuts Avenue Johnnesburg

NTT DATA, Middle East and Africa (MEA)
Tier III (indicative)
on quote

Africa Data Centres Johannesburg

Africa Data Centres
on quote

Huawei Cloud Johannesburg DC

Huawei Cloud
on quote

NTT Johannesburg DC1

NTT
Tier III (indicative)
on quote

Digital Realty JNB1 Johannesburg

Digital Realty
1 baieTier III (indicative)
on quote

What Johannesburg allows

Johannesburg has 20 data centers, operated by Open Access Data Centres, Equinix, Inc., Teraco Data Environments Pty Ltd, Reflex Solutions (Pty) Ltd. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Connectivity from Johannesburg

390 networks are listed at the sites in Johannesburg according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 6 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Amazon Web Services, Google, Hetzner, Microsoft Azure, Oracle Cloud, OVHcloud, Apple, Meta and 4 more: they are present at the exchange points where 5 of the 20 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Declared certifications: ISO 22301, ISO 27001, PCI DSS, SOC 2. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Johannesburg

A city has no electricity of its own: the sites in Johannesburg are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 81.4% of its electricity from coal (2025). The detail: coal 81.4%, solar 8%, wind 4.7%, nuclear 4.2%, oil (fuel oil, diesel) 0.8%, hydro 0.8%. Fossil fuels (coal, gas, oil) account for 82.2% of it. A kilowatt-hour there weighs 699 g of CO2, i.e. 1.5 times the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 24.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Johannesburg

Since 1970, 9 earthquakes of magnitude 5 or above have been recorded within 100 km of Johannesburg, and 30 within 200 km. The strongest: magnitude 5.7 in 1974, 53 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Johannesburg does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Johannesburg

The nearest site outside Johannesburg is 8 km away, in Isando. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in South Africa

Advertisement