BCP vs DRP: what’s the difference?

Direct answer

BCP keeps the business running WITHOUT interruption (active backup site, continuous replication); DRP RESTARTS it after a disaster (delay = RTO). BCP costs more; many combine both.

BCP (business continuity plan): IT does not stop. An active backup site takes over immediately — continuous replication, automatic or near-automatic failover. The goal is “zero perceived interruption”, at the price of duplicated infrastructure and a permanent inter-site link.

DRP (disaster recovery plan): IT restarts after the disaster, from backups or asynchronous replication, within a target delay (RTO) of hours to days. Cheaper, but you accept the interruption.

Mature architectures often combine both: BCP on a nearby data center (synchronous replication, same metro) for common failures, DRP on a distant site (separate risk zone) for major disasters. Both require distinct data centers and regular failover testing — an untested plan does not exist.

Current benchmarks from our catalog (updated 2026-11-01)
Cross-connect90–170 €/mo
IP transit 1 Gbps150–400 €/mo
Quarter rack250–500 €/mo
Power150–260 €/kVA/mo
IPv4 address2–3 €/IP/mo