Kitwe has 1 data center listed on DataColoc, operated notably by INFRATEL Corporation Zambia Limited. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Kitwe (server housing) relies on one listed data center, operated by INFRATEL Corporation Zambia Limited. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in Kitwe?

DataColoc lists 1 data center offering colocation in Kitwe (INFRATEL Corporation Zambia Limited). The nearest alternatives are listed below, with their distance.

What connectivity is available in Kitwe?

IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Kitwe?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Kitwe →

INFRATEL Data Centre - Disaster Recovery

INFRATEL Corporation Zambia Limited · 10101
on quote

What Kitwe allows

The data center listed in Kitwe is operated by INFRATEL Corporation Zambia Limited.

The electricity behind Kitwe

A city has no electricity of its own: the sites in Kitwe are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 86.2% of its electricity from hydro (2024). The detail: hydro 86.2%, coal 10.8%, oil (fuel oil, diesel) 1.7%, solar 0.9%. Fossil fuels (coal, gas, oil) account for 12.5% of it. A kilowatt-hour there weighs 120 g of CO2, i.e. 3.8 times less than the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 4.3 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Kitwe

No earthquake of magnitude 5 or above has been recorded within 200 km of Kitwe since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Kitwe does not allow

With a single listed site, Kitwe cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Kitwe

The nearest site outside Kitwe is 289 km away, in Lusaka (4 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.