Compare & price
HomeData centersCzechiaUherske Hradiste

Data centers in Uherske Hradiste

Uherske Hradiste has 1 data center listed on DataColoc, operated notably by Dat, s.r.o.. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Uherske Hradiste →

Dat, s.r.o

Dat, s.r.o. · 68601
Sovereign (outside US CLOUD Act)
on quote

What Uherske Hradiste allows

The data center listed in Uherske Hradiste is operated by Dat, s.r.o..

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Uherske Hradiste

A city has no electricity of its own: the sites in Uherske Hradiste are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, nuclear, supplies only 42.3% (2025). The detail: nuclear 42.3%, coal 35.2%, bioenergy 8%, solar 5.8%, natural gas 5.4%, hydro 2.3%. Fossil fuels (coal, gas, oil) account for 40.8% of it. A kilowatt-hour there weighs 401 g of CO2, i.e. 1.1 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 14.2 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Uherske Hradiste

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Uherske Hradiste, and 5 within 200 km. The strongest: magnitude 5.3 in 2000, 140 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Uherske Hradiste does not allow

With a single listed site, Uherske Hradiste cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Uherske Hradiste

The nearest site outside Uherske Hradiste is 60 km away, in Olomouc. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Czechia