Compare & price
HomeData centersTanzaniaTanga

Data centers in Tanga

Tanga has 1 data center listed on DataColoc, operated notably by Tanzania Telecommunications Corporation (TTCL Corporation). Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Tanga →

TTCL Tanga Telephone House

Tanzania Telecommunications Corporation (TTCL Corporation)
2 networks present
on quote

What Tanga allows

The data center listed in Tanga is operated by Tanzania Telecommunications Corporation (TTCL Corporation).

Connectivity from Tanga

2 networks are listed at the sites in Tanga according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Tanga

A city has no electricity of its own: the sites in Tanga are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 62.8% of its electricity from natural gas (2024). The detail: natural gas 62.8%, hydro 31.7%, oil (fuel oil, diesel) 4.3%, bioenergy 0.8%, solar 0.5%. Fossil fuels (coal, gas, oil) account for 67.1% of it. A kilowatt-hour there weighs 345 g of CO2, i.e. 1.3 times less than the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 12.2 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Tanga

Since 1970, 1 earthquake of magnitude 5 or above has been recorded within 100 km of Tanga, and 4 within 200 km. The strongest: magnitude 5.5 in 1990, 151 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Tanga does not allow

With a single listed site, Tanga cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Tanga

The nearest site outside Tanga is 194 km away, in Dar es Salaam (9 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Tanzania