Boden has 1 data center listed on DataColoc, operated notably by Hydro66. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Boden →

Hydro66 Boden

Hydro66
Sovereign (outside US CLOUD Act)
on quote

What Boden allows

The data center listed in Boden is operated by Hydro66.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Boden

A city has no electricity of its own: the sites in Boden are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, hydro, supplies only 40% (2025). The detail: hydro 40%, nuclear 27.6%, wind 22.8%, bioenergy 5.8%, solar 2.6%, oil (fuel oil, diesel) 1.2%. Fossil fuels (coal, gas, oil) account for 1.3% of it. A kilowatt-hour there weighs 35 g of CO2, i.e. 13.1 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1.2 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Boden

No earthquake of magnitude 5 or above has been recorded within 200 km of Boden since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Boden does not allow

With a single listed site, Boden cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Boden

The nearest site outside Boden is 80 km away, in Luleå. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.