Juba has 1 data center listed on DataColoc, operated notably by Trinity Technologies Ltd. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.
Compare data centers in Juba →The data center listed in Juba is operated by Trinity Technologies Ltd.
A city has no electricity of its own: the sites in Juba are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 98.2% of its electricity from oil (fuel oil, diesel) (2024). The detail: oil (fuel oil, diesel) 98.2%, solar 1.8%. Fossil fuels (coal, gas, oil) account for 98.2% of it. A kilowatt-hour there weighs 643 g of CO2, i.e. 1.4 times the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 22.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.
Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.
With a single listed site, Juba cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.