Compare & price
HomeData centersSomaliaBerbera

Data centers in Berbera

Berbera has 1 data center listed on DataColoc, operated notably by Wingu Africa Data Center PLC. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Berbera →

Wingu Berbera

Wingu Africa Data Center PLC
1 networks present
on quote

What Berbera allows

The data center listed in Berbera is operated by Wingu Africa Data Center PLC.

Connectivity from Berbera

1 network is listed at the sites in Berbera according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Berbera

A city has no electricity of its own: the sites in Berbera are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 79.1% of its electricity from oil (fuel oil, diesel) (2024). The detail: oil (fuel oil, diesel) 79.1%, solar 18.6%, wind 2.3%. Fossil fuels (coal, gas, oil) account for 79.1% of it. A kilowatt-hour there weighs 512 g of CO2, i.e. 1.1 times the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 18.2 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Berbera

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Berbera, and 10 within 200 km. The strongest: magnitude 5.6 in 1979, 190 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Berbera does not allow

With a single listed site, Berbera cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Berbera

← All data centers in Somalia