Compare & price
HomeData centersUnited KingdomCoventry

Data centers in Coventry

Coventry has 1 data center listed on DataColoc, operated notably by UK Dedicated Servers Limited. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Coventry →

UK Servers Coventry

UK Dedicated Servers Limited ยท CV4 9UT
24 networks present
on quote

What Coventry allows

The data center listed in Coventry is operated by UK Dedicated Servers Limited.

Connectivity from Coventry

24 networks are listed at the sites in Coventry according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

The electricity behind Coventry

A city has no electricity of its own: the sites in Coventry are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 31.1% (2025). The detail: natural gas 31.1%, wind 29.4%, bioenergy 14.1%, nuclear 12.4%, solar 6.6%, oil (fuel oil, diesel) 4.4%. Fossil fuels (coal, gas, oil) account for 35.6% of it. A kilowatt-hour there weighs 217 g of CO2, i.e. 2.1 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 7.7 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Coventry

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Coventry, and 1 within 200 km. The strongest: magnitude 5 in 1984, 185 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Coventry does not allow

With a single listed site, Coventry cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Coventry

The nearest site outside Coventry is 20 km away, in Rugby (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in United Kingdom