Iași has 1 data center listed on DataColoc, operated notably by Top Telecom. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Iași (server housing) relies on one listed data center, operated by Top Telecom. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in Iași?

DataColoc lists 1 data center offering colocation in Iași (Top Telecom). The nearest alternatives are listed below, with their distance.

What connectivity is available in Iași?

IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Iași?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Iași →

Top Telecom

Top Telecom · 700154
Sovereign (outside US CLOUD Act)
on quote

What Iași allows

The data center listed in Iași is operated by Top Telecom.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Iași

A city has no electricity of its own: the sites in Iași are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, hydro, supplies only 24.3% (2025). The detail: hydro 24.3%, nuclear 20.5%, natural gas 18.7%, coal 13.4%, wind 12%, solar 9.8%. Fossil fuels (coal, gas, oil) account for 32.5% of it. A kilowatt-hour there weighs 251 g of CO2, i.e. 1.8 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 8.9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Iași

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Iași, and 25 within 200 km. The strongest: magnitude 7.5 in 1977, 166 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Iași does not allow

With a single listed site, Iași cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Iași

The nearest site outside Iași is 210 km away, in Brăila. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.