Compare & price
HomeData centersPeruLurin

Data centers in Lurin

Lurin has 1 data center listed on DataColoc, operated notably by Telxius Cable. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Lurin →

Telxius Lima DC

Telxius Cable ยท 0000
17 networks present
on quote

What Lurin allows

The data center listed in Lurin is operated by Telxius Cable.

Connectivity from Lurin

17 networks are listed at the sites in Lurin according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Amazon Web Services, Meta, Akamai, Cloudflare, Fastly: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

The electricity behind Lurin

A city has no electricity of its own: the sites in Lurin are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 56.1% of its electricity from hydro (2025). The detail: hydro 56.1%, natural gas 36.1%, wind 3.5%, solar 3%, bioenergy 1.1%. Fossil fuels (coal, gas, oil) account for 36.3% of it. A kilowatt-hour there weighs 238 g of CO2, i.e. 1.9 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 8.4 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Lurin

Since 1970, 35 earthquakes of magnitude 5 or above have been recorded within 100 km of Lurin, and 123 within 200 km. The strongest: magnitude 8 in 2007, 125 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Lurin does not allow

With a single listed site, Lurin cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Lurin

The nearest site outside Lurin is 24 km away, in Lima (8 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Peru