Compare & price
HomeData centersNetherlandsMeppel

Data centers in Meppel

Meppel has 1 data center listed on DataColoc, operated notably by KoloDC. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Meppel →

KoloDC NL2

KoloDC ยท 7942KG
Sovereign (outside US CLOUD Act)52 networks present
on quote

What Meppel allows

The data center listed in Meppel is operated by KoloDC.

Connectivity from Meppel

52 networks are listed at the sites in Meppel according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 2 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Google, Hetzner, OVHcloud, Meta, Cloudflare: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Meppel

A city has no electricity of its own: the sites in Meppel are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 34.9% (2025). The detail: natural gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%, oil (fuel oil, diesel) 3.9%. Fossil fuels (coal, gas, oil) account for 45.9% of it. A kilowatt-hour there weighs 254 g of CO2, i.e. 1.8 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Meppel

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Meppel, and 1 within 200 km. The strongest: magnitude 5.4 in 1992, 176 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Meppel does not allow

With a single listed site, Meppel cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Meppel

The nearest site outside Meppel is 23 km away, in Zwolle (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Netherlands