Compare & price
HomeData centersNigeriaIbeju-Lekki

Data centers in Ibeju-Lekki

Ibeju-Lekki has 1 data center listed on DataColoc, operated notably by Digital Realty Lagos. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Ibeju-Lekki →

Digital Realty Lekki (LKK1-2)

Digital Realty Lagos ยท 105101
1 baieTier III (indicative)6 networks present
on quote

What Ibeju-Lekki allows

The data center listed in Ibeju-Lekki is operated by Digital Realty Lagos. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Connectivity from Ibeju-Lekki

6 networks are listed at the sites in Ibeju-Lekki according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Amazon Web Services, Google, Microsoft Azure, Meta, Akamai, Cloudflare: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Note: operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Ibeju-Lekki

A city has no electricity of its own: the sites in Ibeju-Lekki are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 68.7% of its electricity from natural gas (2025). The detail: natural gas 68.7%, hydro 30.9%. Fossil fuels (coal, gas, oil) account for 68.7% of it. A kilowatt-hour there weighs 456 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16.2 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Ibeju-Lekki

No earthquake of magnitude 5 or above has been recorded within 200 km of Ibeju-Lekki since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Ibeju-Lekki does not allow

With a single listed site, Ibeju-Lekki cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Ibeju-Lekki

The nearest site outside Ibeju-Lekki is 7 km away, in Lekki. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Nigeria