Compare & price
Home › Data centers › Mexico › Benito Juárez

Server colocation & hosting in Benito Juárez

Benito Juárez has 1 data center listed on DataColoc, operated notably by Triara Mty. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Benito Juárez (server housing) relies on one listed data center, operated by Triara Mty. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in Benito Juárez?

DataColoc lists 1 data center offering colocation in Benito Juárez (Triara Mty). The nearest alternatives are listed below, with their distance.

What connectivity is available in Benito Juárez?

IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Benito Juárez?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Benito Juárez →

Triara Cancun

Triara Mty · 77500
on quote

What Benito Juárez allows

The data center listed in Benito Juárez is operated by Triara Mty.

The electricity behind Benito Juárez

A city has no electricity of its own: the sites in Benito Juárez are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 61.6% of its electricity from natural gas (2025). The detail: natural gas 61.6%, oil (fuel oil, diesel) 9.4%, hydro 8.1%, solar 7.4%, wind 6%, coal 3%. Fossil fuels (coal, gas, oil) account for 74% of it. A kilowatt-hour there weighs 474 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Benito Juárez

No earthquake of magnitude 5 or above has been recorded within 200 km of Benito Juárez since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Benito Juárez does not allow

With a single listed site, Benito Juárez cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Benito Juárez

The nearest site outside Benito Juárez is 293 km away, in Mérida (4 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Mexico