Monrovia has 1 data center listed on DataColoc, operated notably by Cable Consortium of Liberia. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.
Compare data centers in Monrovia →The data center listed in Monrovia is operated by Cable Consortium of Liberia.
2 networks are listed at the sites in Monrovia according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.
A city has no electricity of its own: the sites in Monrovia are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 52.6% of its electricity from hydro (2024). The detail: hydro 52.6%, oil (fuel oil, diesel) 45.6%, solar 1.8%. Fossil fuels (coal, gas, oil) account for 45.6% of it. A kilowatt-hour there weighs 316 g of CO2, i.e. 1.4 times less than the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 11.2 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.
Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.
With a single listed site, Monrovia cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.