Shuwaikh has 1 data center listed on DataColoc, operated notably by Mobile Telecommunication Company - ZAIN KW. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.
Compare data centers in Shuwaikh →The data center listed in Shuwaikh is operated by Mobile Telecommunication Company - ZAIN KW.
1 network is listed at the sites in Shuwaikh according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.
A city has no electricity of its own: the sites in Shuwaikh are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 62% of its electricity from natural gas (2025). The detail: natural gas 62%, oil (fuel oil, diesel) 35.8%, wind 2%. Fossil fuels (coal, gas, oil) account for 97.8% of it. A kilowatt-hour there weighs 635 g of CO2, i.e. 1.4 times the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 22.5 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.
Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.
With a single listed site, Shuwaikh cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.