Data centers in Nago

Nago has 1 data center listed on DataColoc, operated notably by Qualysite Technologies Inc.. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Nago →

Nago Mirai2 Data Center

Qualysite Technologies Inc. ยท 905-2172
1 networks present
on quote

What Nago allows

The data center listed in Nago is operated by Qualysite Technologies Inc..

Connectivity from Nago

1 network is listed at the sites in Nago according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

The electricity behind Nago

A city has no electricity of its own: the sites in Nago are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 32.8% (2025). The detail: natural gas 32.8%, coal 32.1%, solar 9.8%, nuclear 9.1%, hydro 7.2%, bioenergy 5.3%. Fossil fuels (coal, gas, oil) account for 67.4% of it. A kilowatt-hour there weighs 477 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16.9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Nago

Since 1970, 117 earthquakes of magnitude 5 or above have been recorded within 100 km of Nago, and 306 within 200 km. The strongest: magnitude 7 in 2010, 77 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Nago does not allow

With a single listed site, Nago cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Nago

The nearest site outside Nago is 4 km away, in Ginoza Village. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Japan