Compare & price
HomeData centersItalyFerrara

Data centers in Ferrara

Ferrara has 1 data center listed on DataColoc, operated notably by Lepida S.c.p.A.. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Ferrara →

FEIX

Lepida S.c.p.A. ยท 44122
Sovereign (outside US CLOUD Act)10 networks present
on quote

What Ferrara allows

The data center listed in Ferrara is operated by Lepida S.c.p.A..

Connectivity from Ferrara

10 networks are listed at the sites in Ferrara according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Ferrara

A city has no electricity of its own: the sites in Ferrara are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 47.2% (2025). The detail: natural gas 47.2%, solar 16.9%, hydro 15.8%, wind 8.1%, bioenergy 5.9%, oil (fuel oil, diesel) 2.6%. Fossil fuels (coal, gas, oil) account for 51.2% of it. A kilowatt-hour there weighs 285 g of CO2, i.e. 1.6 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 10.1 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Ferrara

Since 1970, 13 earthquakes of magnitude 5 or above have been recorded within 100 km of Ferrara, and 40 within 200 km. The strongest: magnitude 6.1 in 1976, 177 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Ferrara does not allow

With a single listed site, Ferrara cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Ferrara

The nearest site outside Ferrara is 40 km away, in Bologna (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Italy