Compare & price
HomeData centersItalyBoissano

Data centers in Boissano

Boissano has 1 data center listed on DataColoc, operated notably by Rocket Way s.r.l.. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Boissano (server housing) relies on one listed data center, operated by Rocket Way s.r.l.. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. Its top-connected site lists 1 network. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in Boissano?

DataColoc lists 1 data center offering colocation in Boissano (Rocket Way s.r.l.). The nearest alternatives are listed below, with their distance.

What connectivity is available in Boissano?

The site lists up to 1 network. IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Boissano?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Boissano →

Rocket Way DC Boissano

Rocket Way s.r.l. · 17054
Sovereign (outside US CLOUD Act)1 networks present
on quote

What Boissano allows

The data center listed in Boissano is operated by Rocket Way s.r.l..

Connectivity from Boissano

1 network is listed at the sites in Boissano according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Boissano

A city has no electricity of its own: the sites in Boissano are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 47.2% (2025). The detail: natural gas 47.2%, solar 16.9%, hydro 15.8%, wind 8.1%, bioenergy 5.9%, oil (fuel oil, diesel) 2.6%. Fossil fuels (coal, gas, oil) account for 51.2% of it. A kilowatt-hour there weighs 285 g of CO2, i.e. 1.6 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 10.1 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Boissano

Since 1970, 1 earthquake of magnitude 5 or above has been recorded within 100 km of Boissano, and 10 within 200 km. The strongest: magnitude 5.8 in 1971, 186 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Boissano does not allow

With a single listed site, Boissano cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Boissano

The nearest site outside Boissano is 64 km away, in Genoa (4 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Italy