Data centers in Banjarmasin

Banjarmasin has 1 data center listed on DataColoc, operated notably by PT Telekomunikasi Indonesia Int. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Banjarmasin →

neuCentrIX - Ulin

PT Telekomunikasi Indonesia Int ยท 70234
6 networks present
on quote

What Banjarmasin allows

The data center listed in Banjarmasin is operated by PT Telekomunikasi Indonesia Int.

Connectivity from Banjarmasin

6 networks are listed at the sites in Banjarmasin according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

The electricity behind Banjarmasin

A city has no electricity of its own: the sites in Banjarmasin are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 61.5% of its electricity from coal (2024). The detail: coal 61.5%, natural gas 18.5%, hydro 7.3%, bioenergy 5.7%, geothermal and other renewables 4.5%, oil (fuel oil, diesel) 1.9%. Fossil fuels (coal, gas, oil) account for 81.9% of it. A kilowatt-hour there weighs 680 g of CO2, i.e. 1.5 times the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 24.1 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Banjarmasin

No earthquake of magnitude 5 or above has been recorded within 200 km of Banjarmasin since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Banjarmasin does not allow

With a single listed site, Banjarmasin cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Banjarmasin

The nearest site outside Banjarmasin is 336 km away, in Kalimantan Timur. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Indonesia