Compare & price
HomeData centersGuineaConakry

Data centers in Conakry

Conakry has 1 data center listed on DataColoc, operated notably by GUILAB. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Conakry →

GUILAB Datacenter

GUILAB ยท 1809
5 networks present
on quote

What Conakry allows

The data center listed in Conakry is operated by GUILAB.

Connectivity from Conakry

5 networks are listed at the sites in Conakry according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

The electricity behind Conakry

A city has no electricity of its own: the sites in Conakry are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 74.4% of its electricity from hydro (2024). The detail: hydro 74.4%, oil (fuel oil, diesel) 24.8%, solar 0.7%. Fossil fuels (coal, gas, oil) account for 24.8% of it. A kilowatt-hour there weighs 181 g of CO2, i.e. 2.5 times less than the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 6.4 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Conakry

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Conakry, and 1 within 200 km. The strongest: magnitude 5 in 2021, 117 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Conakry does not allow

With a single listed site, Conakry cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

← All data centers in Guinea