Kutaisi has 1 data center listed on DataColoc, operated notably by Internet Exchange Association of Georgia. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.
Compare data centers in Kutaisi →The data center listed in Kutaisi is operated by Internet Exchange Association of Georgia.
2 networks are listed at the sites in Kutaisi according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.
A city has no electricity of its own: the sites in Kutaisi are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 78.8% of its electricity from hydro (2025). The detail: hydro 78.8%, natural gas 20.4%, wind 0.6%. Fossil fuels (coal, gas, oil) account for 20.4% of it. A kilowatt-hour there weighs 146 g of CO2, i.e. 3.1 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 5.2 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.
Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.
With a single listed site, Kutaisi cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.