Compare & price
Home › Data centers › Gambia › Serrekunda

Data centers in Serrekunda

Serrekunda has 1 data center listed on DataColoc, operated notably by Gamtel. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Serrekunda (server housing) relies on one listed data center, operated by Gamtel. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. Its top-connected site lists 1 network. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in Serrekunda?

DataColoc lists 1 data center offering colocation in Serrekunda (Gamtel). The nearest alternatives are listed below, with their distance.

What connectivity is available in Serrekunda?

The site lists up to 1 network. IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Serrekunda?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Serrekunda →

Kairaba Exchange, Serekunda

Gamtel
1 networks present
on quote

What Serrekunda allows

The data center listed in Serrekunda is operated by Gamtel.

Connectivity from Serrekunda

1 network is listed at the sites in Serrekunda according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Serrekunda

A city has no electricity of its own: the sites in Serrekunda are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 100% of its electricity from oil (fuel oil, diesel) (2024). The detail: oil (fuel oil, diesel) 100%. Fossil fuels (coal, gas, oil) account for 100% of it. A kilowatt-hour there weighs 667 g of CO2, i.e. 1.5 times the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 23.7 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What Serrekunda does not allow

With a single listed site, Serrekunda cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

← All data centers in Gambia