Compare & price
HomeData centersFranceSt Jean De Maurienne

Data centers in St Jean De Maurienne

St Jean De Maurienne has 1 data center listed on DataColoc, operated notably by Alliance Reseaux SAS. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in St Jean De Maurienne (server housing) relies on one listed data center, operated by Alliance Reseaux SAS. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in St Jean De Maurienne?

DataColoc lists 1 data center offering colocation in St Jean De Maurienne (Alliance Reseaux SAS). The nearest alternatives are listed below, with their distance.

What connectivity is available in St Jean De Maurienne?

IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in St Jean De Maurienne?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in St Jean De Maurienne →

Alliance Réseaux

Alliance Reseaux SAS · 73300
Sovereign (outside US CLOUD Act)
on quote

What St Jean De Maurienne allows

The data center listed in St Jean De Maurienne is operated by Alliance Reseaux SAS.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind St Jean De Maurienne

A city has no electricity of its own: the sites in St Jean De Maurienne are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 68.8% of its electricity from nuclear (2025). The detail: nuclear 68.8%, hydro 10.4%, wind 8.2%, solar 5.6%, natural gas 3%, oil (fuel oil, diesel) 1.8%. Fossil fuels (coal, gas, oil) account for 5.1% of it. A kilowatt-hour there weighs 41 g of CO2, i.e. 11.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1.5 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under St Jean De Maurienne

Since 1970, 2 earthquakes of magnitude 5 or above have been recorded within 100 km of St Jean De Maurienne, and 3 within 200 km. The strongest: magnitude 5.5 in 1983, 62 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What St Jean De Maurienne does not allow

With a single listed site, St Jean De Maurienne cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near St Jean De Maurienne

The nearest site outside St Jean De Maurienne is 52 km away, in Grenoble (5 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in France