Saint-Gaudens has 1 data center listed on DataColoc, operated notably by PROSOLUCE SAS. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.
Colocation in Saint-Gaudens (server housing) relies on one listed data center, operated by PROSOLUCE SAS. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. Its top-connected site lists 3 networks. For a wider choice, nearby cities and their distances are listed below.
DataColoc lists 1 data center offering colocation in Saint-Gaudens (PROSOLUCE SAS). The nearest alternatives are listed below, with their distance.
The site lists up to 3 networks. IP transit and cross-connects can be estimated based on your needs using the comparison tool.
No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.
Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.
Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.
Compare data centers in Saint-Gaudens →The data center listed in Saint-Gaudens is operated by PROSOLUCE SAS.
3 networks are listed at the sites in Saint-Gaudens according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.
Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.
A city has no electricity of its own: the sites in Saint-Gaudens are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 68.8% of its electricity from nuclear (2025). The detail: nuclear 68.8%, hydro 10.4%, wind 8.2%, solar 5.6%, natural gas 3%, oil (fuel oil, diesel) 1.8%. Fossil fuels (coal, gas, oil) account for 5.1% of it. A kilowatt-hour there weighs 41 g of CO2, i.e. 11.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1.5 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.
Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.
Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Saint-Gaudens, and 1 within 200 km. The strongest: magnitude 5.3 in 1978, 138 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.
Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.
With a single listed site, Saint-Gaudens cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.
The nearest site outside Saint-Gaudens is 60 km away, in Auch. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.