Compare & price
HomeData centersUnited StatesGatineau

Data centers in Gatineau

Gatineau has 1 data center listed on DataColoc, operated notably by Equinix. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Gatineau →

Equinix OT1

Equinix
1 baieTier III (indicative)
on quote

What Gatineau allows

The data center listed in Gatineau is operated by Equinix. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Compliance and sovereignty

Note: operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Gatineau

A city has no electricity of its own: the sites in Gatineau are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 40% (2025). The detail: natural gas 40%, nuclear 17.4%, coal 16.3%, wind 10.3%, solar 8.6%, hydro 5.3%. Fossil fuels (coal, gas, oil) account for 57% of it. A kilowatt-hour there weighs 384 g of CO2, i.e. 1.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 13.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Gatineau

Since 1970, 2 earthquakes of magnitude 5 or above have been recorded within 100 km of Gatineau, and 3 within 200 km. The strongest: magnitude 5.3 in 2010, 34 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Gatineau does not allow

With a single listed site, Gatineau cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Gatineau

The nearest site outside Gatineau is 117 km away, in Malone. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in United States