Gyeonggi-do has 1 data center listed on DataColoc, operated notably by Hostway IDC. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Gyeonggi-do →

Hostway

Hostway IDC ยท 13496
1 networks present
on quote

What Gyeonggi-do allows

The data center listed in Gyeonggi-do is operated by Hostway IDC.

Connectivity from Gyeonggi-do

1 network is listed at the sites in Gyeonggi-do according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Gyeonggi-do

A city has no electricity of its own: the sites in Gyeonggi-do are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, coal, supplies only 31.1% (2025). The detail: coal 31.1%, nuclear 29.6%, natural gas 27.9%, solar 6.1%, bioenergy 3.2%, oil (fuel oil, diesel) 1%. Fossil fuels (coal, gas, oil) account for 60% of it. A kilowatt-hour there weighs 417 g of CO2, i.e. 1.1 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 14.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Gyeonggi-do

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Gyeonggi-do, and 1 within 200 km. The strongest: magnitude 5.1 in 1982, 159 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Gyeonggi-do does not allow

With a single listed site, Gyeonggi-do cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Gyeonggi-do

The nearest site outside Gyeonggi-do is 4 km away, in Seongnam (5 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.