Compare & price
HomeData centersCongo - BrazzavillePointe-Noire

Data centers in Pointe-Noire

Pointe-Noire has 1 data center listed on DataColoc, operated notably by Congo Telecom. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Pointe-Noire →

Congo Telecom Carrier Facility PNR1

Congo Telecom ยท 2027
2 networks present
on quote

What Pointe-Noire allows

The data center listed in Pointe-Noire is operated by Congo Telecom.

Connectivity from Pointe-Noire

2 networks are listed at the sites in Pointe-Noire according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Pointe-Noire

A city has no electricity of its own: the sites in Pointe-Noire are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 73.8% of its electricity from natural gas (2024). The detail: natural gas 73.8%, hydro 20.1%, oil (fuel oil, diesel) 5.3%, bioenergy 0.5%. Fossil fuels (coal, gas, oil) account for 79.1% of it. A kilowatt-hour there weighs 716 g of CO2, i.e. 1.6 times the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 25.4 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Pointe-Noire

No earthquake of magnitude 5 or above has been recorded within 200 km of Pointe-Noire since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Pointe-Noire does not allow

With a single listed site, Pointe-Noire cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Pointe-Noire

The nearest site outside Pointe-Noire is 383 km away, in Brazzaville (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Congo - Brazzaville