Compare & price
HomeData centersBulgariaPlovdiv

Data centers in Plovdiv

Plovdiv has 1 data center listed on DataColoc, operated notably by Neterra Ltd.. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Plovdiv →

Plovdiv Teleport Center

Neterra Ltd. ยท 4000
Sovereign (outside US CLOUD Act)3 networks present
on quote

What Plovdiv allows

The data center listed in Plovdiv is operated by Neterra Ltd..

Connectivity from Plovdiv

3 networks are listed at the sites in Plovdiv according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Google, Hetzner, Microsoft Azure, OVHcloud, Meta, Akamai, Cloudflare: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Plovdiv

A city has no electricity of its own: the sites in Plovdiv are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, nuclear, supplies only 39.1% (2025). The detail: nuclear 39.1%, coal 22.5%, solar 18.2%, hydro 6.7%, natural gas 4.9%, bioenergy 4.5%. Fossil fuels (coal, gas, oil) account for 28.1% of it. A kilowatt-hour there weighs 276 g of CO2, i.e. 1.7 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 9.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Plovdiv

Since 1970, 2 earthquakes of magnitude 5 or above have been recorded within 100 km of Plovdiv, and 12 within 200 km. The strongest: magnitude 5.7 in 1978, 197 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Plovdiv does not allow

With a single listed site, Plovdiv cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Plovdiv

The nearest site outside Plovdiv is 35 km away, in Pazardzhik. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Bulgaria