Compare & price
HomeData centersArgentinaPilar

Data centers in Pilar

Pilar has 1 data center listed on DataColoc, operated notably by EdgeConneX Inc.. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Pilar →

EdgeConneX Buenos Aires (EDCBUE01)

EdgeConneX Inc. · 1633
Tier III (indicative)9 networks present
on quote

What Pilar allows

The data center listed in Pilar is operated by EdgeConneX Inc.. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one.

Connectivity from Pilar

9 networks are listed at the sites in Pilar according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Note: operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Pilar

A city has no electricity of its own: the sites in Pilar are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 52.7% of its electricity from natural gas (2025). The detail: natural gas 52.7%, hydro 17.1%, wind 12.2%, nuclear 7%, oil (fuel oil, diesel) 3.9%, solar 3.4%. Fossil fuels (coal, gas, oil) account for 58.4% of it. A kilowatt-hour there weighs 346 g of CO2, i.e. 1.3 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 12.3 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Pilar

No earthquake of magnitude 5 or above has been recorded within 200 km of Pilar since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Pilar does not allow

With a single listed site, Pilar cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Pilar

The nearest site outside Pilar is 15 km away, in Manuel Alberti. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Argentina