Compare & price
HomeData centersAngolaMorro Bento

Data centers in Morro Bento

Morro Bento has 1 data center listed on DataColoc, operated notably by ELENDE - TECNOLOGIAS DE INFORMACAO - COMERCIO E SERVICOS, LDA. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Morro Bento →

ELENDE - TECNOLOGIAS DE INFORMACAO

ELENDE - TECNOLOGIAS DE INFORMACAO - COMERCIO E SERVICOS, LDA
1 networks present
on quote

What Morro Bento allows

The data center listed in Morro Bento is operated by ELENDE - TECNOLOGIAS DE INFORMACAO - COMERCIO E SERVICOS, LDA.

Connectivity from Morro Bento

1 network is listed at the sites in Morro Bento according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Morro Bento

A city has no electricity of its own: the sites in Morro Bento are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 70.6% of its electricity from hydro (2024). The detail: hydro 70.6%, oil (fuel oil, diesel) 17.3%, natural gas 9%, solar 2.8%. Fossil fuels (coal, gas, oil) account for 26.3% of it. A kilowatt-hour there weighs 185 g of CO2, i.e. 2.5 times less than the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 6.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Morro Bento

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Morro Bento, and 1 within 200 km. The strongest: magnitude 5.3 in 2001, 165 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Morro Bento does not allow

With a single listed site, Morro Bento cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Morro Bento

The nearest site outside Morro Bento is 4 km away, in Luanda (7 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Angola